The Kew · last 30 days (Sep 28, 2026 – Oct 28, 2026) · generated Oct 28, 2026 9:28 AM
Units whose cold/warm reports co-occur in time more often than chance — likely shared plumbing. Ordered by who reports first during shared outages (earliest is likely closest to the fault). 0 building-wide events and 0 in-unit fault windows excluded.
No statistically significant groups in this range.
Fixture failed while another tap in the same unit ran hot — repair the fixture (mixing valve / cartridge), not the riser.
None detected.
None in this window.
Onset (tenant-supplied when available) to the hot report clearing the same tap. Mostly-short = recirculation lag; long = supply or valve failure. 0 resolved outages.
| < 1 hr | 0 |
| 1–3 hrs | 0 |
| 3–12 hrs | 0 |
| 12+ hrs | 0 |
| Date | Work | Scope | Issue rate before → after |
|---|---|---|---|
| Aug 13, 2026 | Royal Plumbing - replace the existing building mixing valve with a new valve | Building-wide | 0.00 → 0.00 |